Road Work - Normandy - Maple Leaf Up

Discussions related to the second world war.
Post Reply
User avatar
Temujin
Meritorious
Meritorious
Posts: 2899
Joined: Sat Apr 14, 2018 6:39 pm
Commendations: 137

Road Work - Normandy - Maple Leaf Up

Post by Temujin » Tue Dec 11, 2018 10:54 am

Roadwork

Once off the beaches, all vehicles, wheeled and tracked, faced a number of options. There were three basic classes of route available:
  • Existing macadam roads, 13 - 15 ft wide. Many of these had been damaged by mines or shellfire; most had poor drainage and their verges churned up badly if traffic left the carriageway for any reason.
  • Gravel roads, 10 - 15 ft wide. These were normally used for local traffic only; they were dusty in dry weather and muddy when wet.
  • Earth tracks. These were formed by traffic across the fields, after mine clearance had been completed. They were also dusty in dry weather and liable to deteriorate very quickly during rain. A motor grader was essential to repair damage and to regrade badly rutted sections
Most of the beach exits led directly or indirectly to a village, where narrow streets and damage from shellfire created frequent bottlenecks. Immediate steps were taken to ease sharp corners by demolishing damaged buildings and walls and one-way traffic circuits were set up.

It was also clear that existing roads would break down under the volume of traffic and a number of new roads were constructed. Rubble from damaged walls and buildings was plentiful, and in some areas there were good stocks of broken stone in local quarries. 75 tons of tar were discovered in Bayeux and, with the help of some quarrying and macadam plant brought in by the Sappers, facilities for laying metalled surfaces were soon available.

In addition, various forms of temporary tracking were used. These were delivered either in roll or sectional form, and once the ground had been levelled and stabilised where necessary, they could be laid quickly. Constant maintenance was required, but the tracking could be lifted and then re-laid, either in the same place after remedial work to the sub-base, or in a different location as a particular section of track became redundant for any reason.

Road signs were of great importance, firstly to identify each village, and then to indicate the traffic routes for tracked and wheeled vehicles of different units. In the absence of such signs, everything tended to keep to the same line in order to reduce the risk of straying into a mined area, but this led to rapid surface deterioration when tracked vehicles had to slew at corners. Separate routes for tracked and wheeled vehicles were used whenever possible.

Constant maintenance of these roads and tracks, particularly at the approaches to bridges, was essential. Where possible, bridge approaches were surfaced with macadam. Traffic volume grew to a point where some roads were carrying 5,000 vehicles per day in each direction. In one instance, there were peak figures of 13,000 in one direction and 5,200 in the other.

The demand for stone steadily increased. Several quarries were quickly opened up, initially drawing on existing stocks of quarried material and crushing it down to the sizes required for road construction. French civilians assisted in these quarries, each of which was initially capable of producing up to 300 tons of crushed and graded stone per day.

Later, as the road construction and maintenance programme expanded, more quarry plant was brought in, giving capacities of up to 600 tons per day, plus the ability to produce coated tarmacadam for use on metalled roads and bridge approaches.

The road construction, repair and maintenance programme continued unabated throughout the whole of the campaign in Northwest Europe.

Main supply routes were given a code-word with the addition 'up' going towards the front and 'down' going to the rear, thus MAPLE LEAF UP. Units were allotted a route and a time slot in which to traverse it.

Each formation and unit had a tactical number and road side signs displaying such numbers led straight to the harbour area of the formation or unit.
04D1E3C2-3926-4C06-8EC7-A4B1BA990108.jpeg
04D1E3C2-3926-4C06-8EC7-A4B1BA990108.jpeg (41.36 KiB) Viewed 4284 times
https://web.archive.org/web/20060515145 ... erlord.htm

User avatar
Phil
Founder
Founder
Posts: 522
Joined: Fri Apr 13, 2018 11:19 am
Commendations: 31

Re: Road Work - Normandy - Maple Leaf Up

Post by Phil » Tue Dec 11, 2018 11:25 am

I didn't know where that phrase came from (Maple Leaf Up), thanks.
Phil

WARTIMES.ca
Please consider Donating in order to ensure the continued availability, maintenance and growth of WARTIMES.ca.

User avatar
Temujin
Meritorious
Meritorious
Posts: 2899
Joined: Sat Apr 14, 2018 6:39 pm
Commendations: 137

Re: Road Work - Normandy - Maple Leaf Up

Post by Temujin » Tue Dec 11, 2018 6:13 pm

Phil wrote:
Tue Dec 11, 2018 11:25 am
I didn't know where that phrase came from (Maple Leaf Up), thanks.
A brief description of what “Maple Leaf Up” and “Maple Leaf Down” were:

MAPLE LEAF UP
The title, perhaps, requires a brief explanation. “Maple Leaf Up” was the name of the main route to First Canadian Army during the whole Western Europe operation. To get to the First Canadian Army, one followed the painted maple leaf or written words, MAPLE LEAF, plus the word UP; to get back to the rear areas, away from the army, one followed the maple leaf signs, plus the word DOWN. The tanks and vehicles loaded with supplies and reinforcements for the army rolled along MAPLE LEAF UP; the empty trucks and full ambulances rolled along MAPLE LEAF DOWN.

—Peter Simonds, Edmonton, May 1946


BUT, “Maple Leaf Up” was only ONE of the dozens of marked “ROUTES” used in Europe during the Allied Advances: