Page 3 of 5

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 20, 2018 6:41 pm
by Temujin
v6555[1].jpg
v6555[1].jpg (3.51 KiB) Viewed 68299 times
Tunisia002[1].JPG
Tunisia002[1].JPG (2.97 KiB) Viewed 68299 times
Tunisia001[1].JPG
Tunisia001[1].JPG (3.51 KiB) Viewed 68299 times
Shield Bridge, Caen.jpg
Shield Bridge, Caen.jpg (95.95 KiB) Viewed 68299 times
Shield Bridge, Caen

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:46 pm
by Temujin
A31563F1-BFCC-4051-920E-BBA72F695498.jpeg
A31563F1-BFCC-4051-920E-BBA72F695498.jpeg (123.12 KiB) Viewed 68294 times
Class 70 Bailey Bridge over the River Hase at Haselunne Rebuilt by the 5th Completed May 5th 1945. Christchurch crib pier supporting Double double and Triple single spans. Note span junction posts on top storey of Double double to accommodate transom.


THANK You to Lorraine Campbell for all the information on these 6 posts

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:47 pm
by Temujin
941DB198-7D05-4162-A9AA-F78390C13C17.jpeg
941DB198-7D05-4162-A9AA-F78390C13C17.jpeg (90.08 KiB) Viewed 68294 times
Class 40 DD Bailey Bridge ove the River Hase at Haselunne Constructed by 1 Canadian Army Troops. Completed May 3rd, 45. Normal double double construction

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:49 pm
by Temujin
Martin Bridge

Martin Bridge was constructed in Oct 44 by I Canadian Army Troops Engineers over the Albert Canal near Herenthels
CDAAAE84-39F5-4919-9BF1-75E1CEDADEEC.jpeg
CDAAAE84-39F5-4919-9BF1-75E1CEDADEEC.jpeg (85.31 KiB) Viewed 68292 times
Martin Bridge consisted of two separate Bailey continuous bridges on pile piers
C1B01513-3EDE-4B54-8449-3973F77F547F.jpeg
C1B01513-3EDE-4B54-8449-3973F77F547F.jpeg (119.77 KiB) Viewed 68293 times

Martin Bridge details of piers
9E7CF40B-C759-4FEE-A52B-0EBA86F73D52.jpeg
9E7CF40B-C759-4FEE-A52B-0EBA86F73D52.jpeg (123.85 KiB) Viewed 68294 times
C6A4995B-E018-41B4-AC24-B55010141ADD.jpeg
C6A4995B-E018-41B4-AC24-B55010141ADD.jpeg (52.36 KiB) Viewed 68294 times
09E09C55-9520-4BF6-A07B-61F4CFCB6C01.jpeg
09E09C55-9520-4BF6-A07B-61F4CFCB6C01.jpeg (49.65 KiB) Viewed 68294 times

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:51 pm
by Temujin
57A56801-176A-4565-8888-CCBA4D719E67.jpeg
57A56801-176A-4565-8888-CCBA4D719E67.jpeg (152.99 KiB) Viewed 68294 times
A view along the low level bridge to Emmerich

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:52 pm
by Temujin
MacLean Bridge at Emmerich
357086E4-5F07-4108-BA89-27D200491519.jpeg
357086E4-5F07-4108-BA89-27D200491519.jpeg (190.44 KiB) Viewed 68294 times

Re: Bridge and Assault Crossing Equipment

Posted: Thu May 31, 2018 12:56 pm
by Temujin
D549D33A-7D8E-4FCF-8334-523DB70E453C.jpeg
D549D33A-7D8E-4FCF-8334-523DB70E453C.jpeg (230.33 KiB) Viewed 68290 times
A3A73665-8BA5-457A-B2B7-C9A7722A4B75.jpeg
A3A73665-8BA5-457A-B2B7-C9A7722A4B75.jpeg (244.29 KiB) Viewed 68290 times
Part of the completed Walsh Bridge
EBF1E2B9-F5B6-43E3-848F-81BCAFAAED44.jpeg
EBF1E2B9-F5B6-43E3-848F-81BCAFAAED44.jpeg (54.55 KiB) Viewed 68291 times

Walsh Bridge at Mook over the River Maas. The erection of light steel trestle piers on pile drivers. After completion of the pier in the foreground, the river rose and the second, at which the pile driving rig can be seen, was built to a different design
D46C6FBC-C57C-458B-BAD8-63F61EC7C683.jpeg
D46C6FBC-C57C-458B-BAD8-63F61EC7C683.jpeg (99.4 KiB) Viewed 68291 times

Re: Bridge and Assault Crossing Equipment

Posted: Fri Nov 30, 2018 3:25 am
by Temujin
D1142395-46A3-4519-8AC2-919B790759F2.jpeg
D1142395-46A3-4519-8AC2-919B790759F2.jpeg (275.66 KiB) Viewed 68174 times

Re: Bridge and Assault Crossing Equipment

Posted: Mon Aug 12, 2019 10:28 am
by Temujin
The map trace below shows some of the bridges, ferry’s and floating bridges (and their map reference) built over the Orne River in Caen.
4F7E8333-AE6C-4465-A3FC-02638AD442CF.jpeg
4F7E8333-AE6C-4465-A3FC-02638AD442CF.jpeg (151.34 KiB) Viewed 67401 times

Re: Bridge and Assault Crossing Equipment

Posted: Sat Aug 24, 2019 5:29 pm
by Temujin
Bailey Floating Bridge under construction:
527C30C3-E57B-4968-85AF-55DF0DBC3195.jpeg
527C30C3-E57B-4968-85AF-55DF0DBC3195.jpeg (4.69 MiB) Viewed 67332 times