Typical layout of a “bridge site”. Engineers practices building bridges, using this layout in order to KNOW where a part was located on the site. This was especially useful when building bridges at night, as NO LIGHTS were used, and the Engineers needed to find the correct part in the dark.

Drivers, when arriving at the bridging site were also trained to drop their loads of bridge parts using this same layout.

With LOTS of training, Engineer Units could build a typical Bailey Bridge very rapidly, even in the dark, even “under fire” from the enemy.

Engineer units regularily practice “speed building” by holding BRIDGE GALLOPS. Engineer units, would take turns building a bridge, the next unit moving over it, building another bridge, and so on. This method of training developed the speed necessary to build these bridges as quickly as possible.

Image

From the table below, a typical 80 foot single-single bailey bridge could be built (with manpower only) in TWO hours

Image

https://archive.org/stream/ost-military ... 2/mode/1up

Re: Bridge and Assault Crossing Equipment

Posted: Sat May 05, 2018 7:37 am
by Temujin
Image

1st Cdn Field Company, RCE constructing a Bailey Bridge over the Staorine River, 1943

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 6:48 pm
by Temujin
Crossing the Gap
Crossing the Gap.pdf
(1.14 MiB) Downloaded 731 times
Bill Rawling Scientia Canadensis: Canadian Journal of the History of Science, Technology and Medicine / Scientia Canadensis : revue canadienne d'histoire des sciences, des techniques et de la médecine , vol. 9, n° 2, (29) 1985, p. 114-132.

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 6:49 pm
by Temujin
The Bailey: The Amazing, All-Purpose Bridge by Larry D. Roberts
The Amazing Bailey Bridge.pdf
(1.03 MiB) Downloaded 741 times

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 6:51 pm
by Temujin
Field Park Company, RCE
Capture.JPG
Capture.JPG (94.58 KiB) Viewed 56393 times
Div Field Park Company.jpg
Div Field Park Company.jpg (840.52 KiB) Viewed 56393 times

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 6:53 pm
by Temujin
Field Company and Field Squadron
Field Company.JPG
Field Company.JPG (106.92 KiB) Viewed 56393 times
Field Squadron.JPG
Field Squadron.JPG (107.24 KiB) Viewed 56393 times
RCE Company Org Chart.JPG
RCE Company Org Chart.JPG (28.37 KiB) Viewed 56393 times
RCE Typical HQ's Platoon Org Chart.JPG
RCE Typical HQ's Platoon Org Chart.JPG (145.32 KiB) Viewed 56393 times
RCE Typical Platoon Org Chart.JPG
RCE Typical Platoon Org Chart.JPG (125.7 KiB) Viewed 56393 times

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 6:58 pm
by Temujin
Rafting Operations - Bailey Raft
raft[1].jpg
raft[1].jpg (98.67 KiB) Viewed 56393 times
raft2[1].jpg
raft2[1].jpg (88.37 KiB) Viewed 56393 times
raft3[1].jpg
raft3[1].jpg (63.98 KiB) Viewed 56393 times
raft4[1].jpg
raft4[1].jpg (65.78 KiB) Viewed 56393 times

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 06, 2018 11:46 pm
by Temujin
Operation Plunder - Bridge, ferries, and floating bridges across the Rhine River
rhine crossing - operation plunder.pdf
(267.27 KiB) Downloaded 800 times

Re: Bridge and Assault Crossing Equipment

Posted: Mon May 14, 2018 9:05 pm
by Temujin
Churchill Bridge - Triple Truss - Double Storey - Class 40 Bailey Bridge built by the 5th Field Company, RCE over Orne River in Caen
EDCC4C48-C95A-46B6-B2E9-3F4DF28B7513.jpeg
EDCC4C48-C95A-46B6-B2E9-3F4DF28B7513.jpeg (128.58 KiB) Viewed 56379 times
Photo shows “landing nose” of new bridge and engineer’s preparing the bank to recieve it.

67FA41C4-76EE-49E6-8873-5BF6DB95CF23.jpeg
67FA41C4-76EE-49E6-8873-5BF6DB95CF23.jpeg (194.33 KiB) Viewed 56379 times
Photo clearly shows the Bailey is 3 panels wide, and two “storey’s” tall.
1E944CD7-3EC7-4536-BAA5-02851E3D42CE.png
1E944CD7-3EC7-4536-BAA5-02851E3D42CE.png (4.09 MiB) Viewed 56379 times
This photo shows you the bridge class, and who built the bridge (1207 - Is the Tactical code for the 5th Field Company, RCE)


Source: http://sgmcaen.free.fr/les-ponts.htm

Re: Bridge and Assault Crossing Equipment

Posted: Sun May 20, 2018 6:40 pm
by Temujin
2BNRCE-8[1].JPG
2BNRCE-8[1].JPG (162.4 KiB) Viewed 56374 times
2BNRCE-9[1].JPG
2BNRCE-9[1].JPG (137.17 KiB) Viewed 56374 times
a159176-v6[1].jpg
a159176-v6[1].jpg (104.97 KiB) Viewed 56374 times
6996981914_f3b99f25b6[1].jpg
6996981914_f3b99f25b6[1].jpg (157.22 KiB) Viewed 56374 times